My Shop ~ Part 8 ~ The Floor

The concrete floor for my shop was the easiest and best slab I have ever poured was not without difficulties. All ultimately ended well, but as always, there is a story.

For some time now, we have had a pile of cascajo (cas-ca-ho [the letter a has a soft sound in this word] — river run sand and gravel) taking up space in the driveway. Cascajo is great for foundations and large columns. The mix as it is dug from the river has a range of sizes from sand granules to six-inch rocks. But it is not so great for floors because of the larger rocks. The rule of thumb for pouring a slab is no gravel/stone larger in size than one-third the thickness of the slab. I know we should have sifted the pile, but Armando and his crew balked. They said that sifting just isn’t necessary. If you come across a rock that is grande and causing a problem, just pull it out of the slab and throw it aside.

Additionally, most of the pile had been sitting for months and it was permeated with grass, weeds, and roots. I could foresee a problem when it came time to trowel a nice finish, but again the guys said “es normal.”

Here is a photo of the root-infested pile of cascajo:

I’ve learned to pick my fights with the guys because I can really make a fool out of myself; they usually know things that I don’t. A case in point is when two men showed up to put an internet antenna on the roof of the house we rented when we moved to Panama. They arrived with:

  • the antenna and connecting cable
  • a six-foot length of half-inch electrical conduit
  • a small coil of bailing wire
  • a nail
  • a hammer
  • a pair of pliers

I scoffed to myself. Where was the electric drill? Where were the numerous brackets, bolts, and accessories that they would surely need to mount the mast to the roof? And where was the mast? In my opinion they were missing about $129.95 in essential pieces and parts. But I watched.

They found an old tree stump in the yard to use as an anvil. Then with the hammer they pounded flat about three-inches of one end of the electrical conduit. Next with the hammer and nail, they punched a hole in the flat section, then using the bumper on their small van they bent the flat section to a right angle. Next, back to the tree stump they switched ends of the conduit and punched a hole in the conduit about two inches from the end.

Then using the pliers up on the roof they slightly unscrewed three screws that were holding the metal roofing in place, plus a fourth screw all the way. They put the removed screw through the nail hole in the bent end of the conduit and put the screw back into the hole in the roof that it came from and tightened it down. Then they wrapped some bailing wire around one of the loosened screws, ran the wire up and through the hole at the top end of the conduit, and back down and around the second screw, back up and through the conduit, and down to the third screw. They tightened the screws. At this point the conduit mast was triangulated firmly in place. Then they mounted the antenna dish on the conduit and ran the cable to the router on my desk inside the house. D.O.N.E.

So I am careful. I learn a lot from these capable and resourceful men.

But Sr. Murphy often shows up on the job. In the case of the floor slab in my shop, it seems that my image of troweled-smooth concrete is very different from their version. I like it smooth. Very smooth. I don’t want a sandy surface. They like it flattened out so you don’t trip on any of the ridges. They don’t take smooth into account because it is a long day’s work and anally troweling the floor to a mirror finish is just not going to happen.

There is more to the story, but let’s see some photos:

I held my ground on preparing for the slab. I like a nice level couple-inch layer of gravel to pour the slab on. If you pour concrete on dirt, moisture in the dirt will capillary-action wick its way up into the slab. But capillary action can’t happen through the stones because the spaces between the stones are too large. The slab will stay dry. So even though they thought I was stupid, I had a few yards of one-inch stone delivered. Sammy and I spread it level. Jabo wasn’t sure he liked it:

On Thursday, Cynthia and I put welded wire mesh on the floor to keep the slab from cracking. Here is the floor ready for concrete. My laser level is set up to level the concrete, and in the corner is a wooden bull float that I made from scrap.

The guys mixed a big pile of concrete:

And Armando and I spread it out. Because of the large rocks in the mix, it was difficult to raise the wire mesh to the center of the slab, but I got it raised about a third of the way up. Close enough. I’m using the laser level to set the grade so Armando could more easily screed the concrete. You can see he has thrown out a few trouble maker rocks:

Here Erin and Pancho take a break after using 24 sacks of cement:

In the next photo Armando trowels the floor. After wooden floating the floor, you shouldn’t steel trowel the concrete until all the water has disappeared from the surface. This way you won’t be pushing water around, washing the cement away from the granules of sand. But it was pushing 5:00 and the guys (including yours truly) were tired. So Armando pushed the envelope slightly and troweled while there was still water on the surface. I knew I wouldn’t be happy with the finished product, but it is, after all, just a shop.

We finished, cleaned up the tools, and called it a day. The next morning, Saturday, Armando had work elsewhere, so it was just me arriving on the job. I took a look at the floor. I didn’t like it and gave the job a C-minus, maybe a D. It was rough and there wasn’t enough cement “cream” on the top. It was going to be difficult to sweep it clean in the future.

What to do? It is generally a bad idea to apply a skim coat of cement paste onto a concrete floor because in time flakes will spall off the floor. But our floor was still very green, still hydraulically pushing out water. I’ve read that you have a good chance of succeeding with a skim coat if you catch the slab while it is still only a few hours old. The most common reason for needing to do this is when a surprise rainstorm pops up and washes the cream away just after steel troweling a driveway or a patio slab.

So that’s what I did. I got a steel trowel, a bucket of dry cement powder, a bucket of water, and a sponge. I spent most of the day sprinkling cement on the slab, then adding a bit of water by wringing the sponge, then troweling the paste onto and into the floor. I had to take numerous breaks to stand up and straighten the old Arthur Itis knees. At the end of the day I gave the floor a B-plus. I can’t give it an A because the mesh didn’t get lifted as high as I wanted and also because there were a few dips just a bit deeper than I would have liked. Troweling the top coat was gruelingly difficult for my old body, but I am glad that I did it.

I’m spraying the floor with water a few times a day now, and will continue for a week. This will slow the rate of cure and will prevent a lot of surface cracks. Here’s my finished floor slab just after I sprayed it:

The next time I am in the city I plan to go to Discovery and buy a few gallons of garage floor epoxy. With the epoxy, a quick sweep of the broom will clean the floor “real nice.”

I need to let the slab sit and cure without foot traffic for at least a week, so depending on the condition of my knees, I should be back working on the house windows maybe tomorrow.

That’s all for now.

 

My Shop ~ Part 7 ~ Electrical, Repello (Stucco) & Pizza

With the completion of the repello (stucco) on the interior shop walls, Armando and Sammy moved operations to the bathroom walls. Because the bathroom is so small, there was no room for me to to help.

I’ve found over the years that working in small rooms and closets doing tasks such as putting up drywall or painting can be more difficult than working in a larger space. There are still the same number of walls, angles, and corners but there is little room to turn around after you get tools and a ladder inside the space. So Armando was on his own in the “phone booth” bathroom and Sammy kept him supplied with mezcla (mortar mix).

While they were doing the repello, I took a day and cleaned up the repello-ed walls in my shop. There were some trowel marks, rough spots, and small pimples that I wanted to get rid of so the walls would take a nice finish. I have a wet angle grinder and a set of diamond polishing pads. I put the 50-grit pad on the machine and passed it over every square inch of the walls. Here’s the grinder, Hellcat brand; you hook a garden hose up to it, plug it into the wall, and try not to shock the hell out of yourself:

The grinder did a great job, leaving the walls quite smooth and ready to finish.

I’d been having a back and forth debate with myself on whether to paint the walls white or to coat them with a clear acrylic polymer. The white would be nice for light reflection, but it would get dirty very quickly with all the welding and grinding going on in the shop. Also, a good quality paint would cost a hundred bucks or more, and the paint would hide the nice look of the repello-ed walls. Ultimately, the polymer won out and I applied two coats (about $25) with a sponge that same day and the next morning. Here’s the polymer:

The guys were still doing well on their own so I decided to start the interior wiring. Before we laid the concrete block walls, I had decided that I would surface mount the electrical boxes on the walls rather than build the boxes into the walls. I’ve pulled covers off of built-into-the-wall boxes and they are all nasty with rust and corrosion from the concrete.

So after I applied the two coats of polymer sealer, I struck a level line around the shop walls for the receptacle and switch boxes. Even though they are a lot more expensive, I decided to use weatherproof exterior boxes because they won’t rust and there are no holes for spiders to enter and make cozy little nests. In this next photo I have drilled two 1/4-inch holes in the wall and am tapping in screw anchors, called tacos here.

I drilled two holes in each of the boxes and screwed them to the walls. The boxes have little lugs on the back that stand the box off the wall, so I ran a bead of gray urethane caulk around the boxes to seal yet more spider hideouts. I hate to reach for a plug and put my hand in a spider web. You can get some nasty spider bites here in the tropics.

Then I measured and cut PVC conduit and clamped it to the walls and ran it across the floor as needed. I chose PVC conduit because metal conduit would rust fairly quickly, especially under the concrete floor slab. 

I also mounted boxes for lights on the ceiling. Even though I like 4-foot strip fluorescent fixtures, I decided to use individual fluorescent bulbs because the electronics in strip fixtures get blown by the uneven electrical current here. Cynthia helped me pull wires through the conduit. You can also see how nice the concrete walls look; they have a slight shine that you can see on the wall at the left of the window blocks in the photo above.

By the time the electrical was to the point that the concrete floor could be poured, the guys were done with the bathroom walls and some other small details. But before the floor, it was time to repello the exterior walls. The exterior walls are larger than one man can repello in a day and I didn’t want any “cold” stop/start joints so I had to pitch in and sling mud with Armando. Now I can get another dollar a day in my pay envelope because Armando taught me how to apply the repello. Repello-ing is hard work!

Years ago when I was carpentering for a living, someone asked me if it was hard to install a window. I said, “No, not as long as you know what you are doing!” It’s not the same with repello. Even if you know what you are doing, it is still damn hard work.

As of today we have the back side, the east side, and the front side all repello-ed, leaving only the west side that we will tackle tomorrow if I can get out of bed. For the east side, we didn’t start our work day until 11:00 a.m. so that the sun would have time to pass overhead and we could work on the wall in shadow. We finished about 6:00, at which time I flopped into my hammock for the rest of the night. I think Cynthia hooked me up to an IV frijole dip drip so I could get some nutrition while I slept. Here is a photo of the front and east walls just after I hosed them down to help them cure:

There is a tradition here in Panama that when a roof goes on, you have a roof party. So last Friday was the day. I knocked the guys off at 12:30 for a pizza lunch and the rest of the day off. Cynthia and Cedelinda had been making the dough and preparing the toppings:

It’s my job to cook the pizzas. Our fancy Bompani oven isn’t up to the task of cooking pizzas, so some time ago I went down the hill and bought some locally-made firebricks. I cut them in half with my tile saw. Then I lined our BBQ grill with the half-bricks. Like this:

A half-hour preheat turns the BBQ into a Jim Dandy 500-600 degree pizza oven. By the way, I don’t know who Jim Dandy was, and I didn’t know whether to capitalize it or not, so I Googled it. It’s capitalized. And while looking, I found a Jim Dandy BBQ restaurant in Cincinnati, Ohio. Who’d a known. I wonder if they do pizza. Anyway, a big shout out to Jim Dandy’s even though I am a 30+year vegetarian. I love Google!

At this point I put the camera down and started cooking. Cynthia’s pizzas are works of art. I got busy cooking and then planted my face in my pizza and completely forgot to take photos of the finished pizzas. Trust me, they were beauties.

We bought about a dozen pizza pans, the kind that have hundreds of 3/8-inch holes on the bottom. The crusts get nice and brown and the pizzas don’t stick to the pans. We like to have build-your-own pizza parties every year on my birthday. That and homemade chocolate cake makes me happy to be a year older. Or at least I don’t notice.

Anyway, the roof party was a delicious success. The guys were stuffed to their shirt collars and got to take home leftovers. The first time we made pizza for a work crew here each man took a slice. They clearly liked it but were too shy to take more. We had to order them to eat more, at which point they loosened up. It was great fun to see them egging each other on to eat yet another slice. There were lots of jokes about not having to eat for a week and not being able to work because they were too full.

That’s all for now. Maybe next week we can think about pouring the floor in my shop. Stay tuned.

My Shop ~ Part 6 ~ The Roof

Now that the dry season is here, we are making good progress on my shop. All the interior walls are repello-ed (stuccoed) and the roofing metal has been delivered. Here are some photos of walls being finished:

Armando works a wall

We call this little closet "the phone booth"

Gusty winds come with the dry season, so we geared up with ropes and clamps and extra bodies to keep the 24-foot-long roof panels from blowing away. Here we are placing the first panel on the east side of the shop:

Armando and I place the first panel. Gloves are mandatory when working with these over sized razor blades.

Up goes the second panel

After lifting and placing each panel, Sammy and I go up on the roof. He sits on the bottom end of the metal to keep it from becoming airborne, and I take a straight edge and a Sharpie marker and mark locations for screws. Armando follows me, placing a few screws to keep the panel in place.

Break time at the half way mark. Sunglasses are mandatory while working on the highly reflective roofing. Later, much later, the roof will extend out another 15 feet over the carport.

After all the panels were in place, Armando and Sammy went back over the roof and placed the missing screws. What a beautiful day in the tropics!

I included a six-foot roof overhang on the west end of the shop. Below the roof there will be an outside sink, a clothes line, and space for potting plants, etc. It is also a place that Armando can wait out a rainy season deluge. Maybe a hammock is in order:

The larger window is in my shop, the smaller window is in the bathroom.

Here are some inside shots with the roof on:

Now that the roof is finished, I can remove the temporary center stick. It reduced the bounce while working on the roof.

We were finished with the roof about 2:30 so I sent the guys home. Armando proclaims the roof “listo” (LEEZ-to — done, ready):

Will he walk the plank?

Tomorrow Armando and Sammy will go back to repello-ing the remaining bathroom walls.

My job for the day will be to clean up the repello on the interior walls. There are some trowel marks and a few rough edges here and there that need attention before paint. I’m going to start out using a wet angle grinder with a diamond polishing wheel and we’ll see how it goes.

After cleaning up the walls, I’ll make the final decision — white paint or clear polymer finish? I’m leaning toward the polymer as it won’t show the inevitable scuff marks, although the white would make the shop a bit brighter.

After the walls are finished, I can mount the electrical boxes and conduit. I plan on running most of the conduit under the floor slab. I don’t like horizontal conduit because it is a dust collector.

Then we can pour the floor slab and make the front door. Move in is in sight!

That’s all for now. Arf!

Bonus photos:

 

 

 

Windows ~ Part 2 ~ Frames Welded

It has been a while since I started the windows. This has been a big job with hundreds and hundreds of welds and a massive amount of grinding the welds smooth. Working long periods of time with the angle grinder is a problem for me because in the ’70s, I fell off a roof and broke a bone in my right wrist; the bone never healed and is a constant source of pain when I flex my wrist. Because a one-piece bone is in two pieces, my wrist is more and more dislocated as the years go on. So I grind some, take a break then grind some more. I have also been helping Armando with the technical stuff of the shop, such as making sure the roof is the correct pitch, so the windows are taking the time they are taking.

Every window will have two frames; one inside to hold the glass, and a second frame outside to hold the security bars. So far, I have all the frames and security bars welded and ground smooth. A lot of the welds would look even better with some auto body filler (commonly called Bondo), so I am nearing the end of applying and sanding the filler. Here’s what my pile of metal looks like at this point:

A few frames are missing from the photo as they are still on the workbench. You can see that I have taken the design of the curved lines of the cat tails on our front gate and replicated them into the security bars.

My current window-related project is making hinges. I want to be able to open the security bar frames to make window washing and security bar maintenance painting easier. I could have bought some stock steel hinges, but I have seen how thieves easily knock out the hinge pin (even if it is tack welded in place) and gain access to the house. My hinges are a bit beefier. I started with a length of 1/2″ black iron pipe. I spot welded a piece of 1/8″x1″ metal strap iron to the pipe. After cleaning the welds with the angle grinder, I applied two coats of body filler. It looked like this with the first coat of filler being applied:

Then I sanded the assembly smooth with a sandpaper disk on the grinder and cut the 20-foot strip into a whole bunch of 4-inch lengths. I ground the cuts smooth with the grinder. At the bottom of the next photo I show three hinge leaves with a piece of 1/2″ rebar threaded through the leaves. I’ll weld the two ends of the rebar to the leaves, leaving the middle leaf to swing free. Here is the pile of hinge parts:

So that’s where I am with the windows. I hope to get the hinges welded to the frames this week. I still have to fashion a way to lock the security bar frames, but I can see that soon I’ll be cutting holes for the windows in the container walls.

That’s all for now.

My Shop ~ Part 4 ~ Walls And Beams

Prognosticators who get paid to make scientific wild guesses say that we are in a wet La Nina weather pattern. This time they seem to be right because the rainy season shows little sign of giving way to the nearly constant sunshine of the dry season that usually starts like clockwork on December 15th. But still, we are making some construction progress, just not as fast or in as pleasant conditions as we would like.

For my shop, Armando has been working his way up the block walls.

Concrete block walls in Panama are topped off with concrete beams to strengthen and level the top of the wall. I set aside my work on the windows to help Armando get the rebar and forms for the beam in place on the back wall. You can see the wooden form work on the back wall in this next photo, and you can see that he has a few more rows to go on the front wall. Jabo is dog tired from all this activity:

Because of all the young man physical labor needed to pour the beam, I asked Armando to bring another guy for a while. He brought his cousin Sammy, who being low man on the totem pole, got to mix and haul the concrete. Here they are pouring the beam at the top of the back wall:

Jabo wants to help, too. He can easily make the four foot jump to the staging:

After the beam was poured, Armando went back to finishing the blocks on the front wall. Then we stripped the forms from the back beam and formed the beam at the top of the front wall.

For the big door, I’ll bolt a sliding door track to the inside of the concrete beam. I’ll build the door out of 2″x2″ square metal tubing and some of the scrap metal cut from the containers. For security, I have purposely not put many windows in the shop, so the big door will provide a lot of light and air while I work inside.

And by the way, out from the front of the shop will be a large carport roof, so if I am working on a large project, I can easily work undercover in the driveway.

And, that big blank wall to the right of the big shop door looks like an opportunity waiting for some sort of custom art piece. Wait… In the meantime, Cynthia says we can hang a piece of her artwork. For a Breast Cancer Awareness Week art exhibit with friends at a local gallery, Cynthia made a bra to represent what she says the contraptions actually feel like. Looks to me like Madonna would be green with envy:

Made from aluminum window screening, plumbers hanger strapping, pop rivets, washers, and other fittings, this is Cynthia's interpretation of what it is like to wear a bra.

Back to our program, here’s the front beam being poured:

A steady light rain yesterday kept us wet enough and cold enough and muddy enough that after the beam was poured at noon I sent the guys home with a full day’s pay. I went home and took a long hot shower. They don’t have the luxury of hot water in their houses so with perpetually wet clothing, unless they dry the clothes over a wood fire which makes them very smoky smelling, it is likely that they will have “refreados” (head colds) when they return on Monday morning.

That’s all for now. I’ll write another short post about progress on the windows. In the mean time, stay warm and dry.

My Shop ~ Part 3 ~ Walls Going Up

We are now about three weeks into building my shop and the walls are going up.

We have had a lot of interruptions; both Armando and I have had head colds, I took some time to wash the mold off the wooden ceilings in our rental house, I’ve had to make trips to the city to take care of other business, and there has been rain, rain, rain. But still, we are making progress and when I look at today’s batch of photos I am satisfied with all we have accomplished.

Early in the day when it is not raining, Armando works out in the open. But by 10:30 or 11:00 he moves under the tarps. The tarps are a minute to minute affair as the wind whips them, strings break, and the tarps get torn by the rebars sticking up from the columns.

After the house is finished, Armando will go back to working for us one day a week doing yard work. He’ll need a bathroom outside of the house, and it will be more convenient if a bathroom is near my shop so I don’t have to tromp dirt through the house. We decided to take a corner of my shop for a small area for a toilet and shower. In the next picture, Armando lays block by the bathroom door. By the way, wherever a block meets a column, Armando drives a concrete nail part way into the column, then makes a hole in the end of the block, lays the block, then fills the void in the block with mortar, thereby locking the block to the column.

As I mentioned in a previous post, block work here in Panama is not perfect. It’s okay, I keep telling myself. In the next picture you can see that a lot of the blocks simply fall apart.

Here is the same shot but later in the day. I decided to put a small closet in the corner. The main reason for this is to strengthen the door jamb for the main shop door. The door will be eight feet wide. I’ll put a security door on the closet and I can keep small tools such as drills and grinders in the closet.

Here’s an overview of the shop to date:

In other news, I am making progress on fabricating the window frames that will get welded into the container walls. I’ll have a post on that soon, but for now know that I am welding and grinding away on the project. I am welding square 2″x2″x1/16″ metal tubing. If I had an unlimited budget I would have liked to use 1/8″ tubing because it would have been a breeze to weld. The 1/16th inch thick tubing is much more of a challenge as it is oh so very easy to burn right through the tubing while trying to weld. Some of my corners have been great successes, such as this next photo looking straight down on a corner.

Other times I haven’t been so lucky and the welds are, um, ahh, UGLY. In this next picture I am working with two pieces of metal that I cut slightly too short. The magnification of errors resulted in a 3/8″ gap that I had to bridge by using a piece of 3/8″ rebar. All of this mess will of course be ground smooth and will disappear after a few coats of paint are applied. But still, ugly is as ugly does and I present it here without shame:

That’s all for now. Thanks for stopping by.

Paint! ~ We Paint Some Interior Walls And Ceilings

We are making progress. With the interior walls framed and ready for Plycem (tilebacker), it is time to paint. I want to paint before hanging the Plycem because the Plycem will have a clear finish and will not be painted. Doing the job in the paint first, Plycem second order will save us from having to do a lot of masking and taping.

I debated on whether or not to paint over a note that someone had written on one of the walls. The paint won, but I did take a picture of the note. I find it endlessly fascinating that our house has been around the world:

F.C. The best from St. Croix U.S. Virgin Islands. 5/14/2008

I wonder what F.C. and his crew were loading or unloading?

Here is a photo of the paints I chose for the interior walls:

The tube of urethane caulk is actually a windshield adhesive. The tube is aluminum and double sealed to prevent the caulk from drying out. Even so, I wore a hole in the palm of my hand trying to pump it out of the tube with a caulking gun. I ran new beads of this caulk where container walls meet the ceilings and at weld joints that I have made.

The Lanco Oil Red Oxide Polyurethane primer is thinned with mineral spirits and sprayed on nice and smooth.

The Lanco Super Dry Enamel (Esmalte) is thinned with lacquer thinner and dried in just a few minutes.

I’ve seen the question asked on the Internet, “Can I use latex paint to paint a shipping container?” The beauty part of latex is the easy cleanup. It is a lot more work to clean the spray gun when using oil based paints, but it doesn’t make sense to me to spray water on metal and expect it not to rust. When I started painting years ago, I don’t think there was such a thing as latex paint. All I remember is cleaning my first boss’s brushes with turpentine. Oil based paint really is not that bad once you get used to the regiment of cleaning up after yourself. I allow a half hour to forty-five minutes at the end of the day to get everything squeaky clean.

Here’s container 3 all primed and ready for the white top coat:

I bought a roll of yellow "caution" tape to use as masking on conduits and on the hardware on the container exterior doors. Jabo awaits further instructions.

There is hardly any over spray with the HVLP spray gun.

After we sprayed the primer, the next day it was ready for the first of two top coats of white:

This is the north wall of container 3. I really savored the moment when I cut out the two doorways. The nearest doorway goes into what will be our dry (dehumidifier) room. The further door goes into the hallway that will connect to the living room. With the doorways cut I don't have to crawl through walls and go out of my way to get where I am going. It feels more like a house now.

Partly painted. I'm standing in what will be my shop, looking toward the master bedroom. The unpainted square area is in the master bath. It will be cut out and the wall pushed out four feet for the shower. We plan to use glass blocks for at least one wall of the shower.

First coat all done. Note that 34 sheets of half-inch Plycem have been delivered. I can't wait to start hanging it on the interior walls.

We still have to cut holes for windows including above in the clerestory wall, but for now I’m happy with the progress.

Here’s a photo from outside (west side) looking in. The big hole in the wall will be wall to wall, floor to roof windows. The view of the night sky from the bed should be spectacular as there is no artificial light for miles around.

The left container (#4) is part of the master bedroom as is the large open area. This end of the right container (#3) is the hallway between the bedroom and the living room (yet to be built).

Rain has been starting by noon most days, but in the mornings Armando has been working on delineating the east side of the driveway. When we built the driveway we put large rocks in the mud then covered the rocks with tosca. At that time we had no design idea of how the driveway edges would meet the rest of the yard. Now, we have stretched a string line and Armando is digging a ditch. We’ll pour a concrete footing in the ditch then lay a course of concrete block as a curb. Here’s Armando working on the ditch:

With the new garden on the left side of the driveway and this curb on the right, the lot is getting more and more defined.

That’s all for now. Thanks for visiting, and feel free to leave a comment below.

Interior Walls, Wiring, & Plumbing ~ Projects In Progress

This post is mostly about building walls inside shipping containers.

Having been in construction since I was six, I know that there is a natural rhythm to most construction projects. There are periods of time when important work is being done but progress is not very visible. The job seems to be crawling. Then there are the periods of time when the job seems to be flying and progress is very visible. One’s moods can swing on these phases if one is not careful.

I think that the job has just moved from a crawl phase to a flying phase.

Having worked six weeks in the yard, Armando has finally finished filling holes, leveling humps, and removing lots of trunks and roots. He has planted some grass and the yard is starting to be a yard. Additionally, yesterday we moved five coconut palm trees and two other palms (Cousin Christine — yours is being planted this weekend) that we had been holding in a nursery area at our rental house. We planted three of the coconuts by the electric service entrance wall at the southeast corner of the lot. Instant transformation, they are softening that concrete corner. This progress is exciting and a big boost to our moral. We can actually begin to see The Warmth of Home emerging from Job Site Mud and Muck.

Three new coconut palms soften the corner of the lot.

The floor between container 3 and container 4 is ready for rebar and concrete, but we are holding off on that until we do some more infrastructure in the area. It is nice to be able to walk on the floor and be able to more accurately gauge how the spaces will feel. Here is the floor ready for concrete:

We’ve been working on the interior walls in number 3. I used 2″x3″ galvanized steel carriolas to make the wall framework. I framed the walls with the 2x3s as horizontal purlins (a style seen in old barns; the purlins go sideways so that the exterior board siding can be installed vertically). We will screw 4′x8′ Plycem (tilebacker / cement board) sheets to the steel stud work.

Building the walls goes like this: First, determine where a wall will go. I have chosen to place the wall so that the framing is in alignment with an outward bend of the corrugated siding of the container. Perhaps a photo will help:

You can see that the framing for the new wall is placed where the container siding is outward.

Next, I cut a carriola bottom plate to fit between the walls of the container. I drilled some holes in the carriola, measured from two points at the end of the container to get the wall parallel with the container, and screwed it to the floor with 3.5″ drywall screws. After the Plycem is up, the concrete floor will lock this wall in place, so the screws are only a temporary placeholder.

Then, as you can see in the photo above, I cut a vertical stud to sit on the bottom plate. At the top of this stud, you may have to cut a notch out of the stud to fit around the beam at the top of the container like this:

The top beam sticks out more than the bottom beam so you have to cut a notch.

I did this at both sides of my new wall and welded the studs in place.

Then, I cut purlins and welded them in place every two feet on center up the wall like this:

Plycem can now be screwed to the purlins.

By placing the wall where the container corrugations go outward, I can now put the Plycem in place and it will make a nice inside corner. I’ll probably run a small bead of urethane caulk around the Plycem to seal any insect highway gaps.

Here's a scrap of Plycem showing how it will make a nice corner against the container.

Here’s an overview of the three new walls in container 3.

Three new walls framed.

At the far end of the container is a hallway; I will cut holes in the container for a doorway from the living room, into the hallway, then into the master bedroom. By the way, this is the only hallway in the entire house. I avoid hallways if possible; they are major space wasters.

The next space toward where I am taking the photo from is a half bath, accessed from the hallway.

The next, larger space will be a walk-in closet off the master bedroom and studio space for Cynthia’s torchwork (making glass beads), her seed bead stringing, and fabric storage for sewing projects. These spaces will be dehumidified.

The final space, the one that I am standing in in the photo above, will be an eight-foot square deposito (storage closet), accessed by the existing container end doors. This deposito will be for outdoor tools and equipment.

But before the Plycem goes up, I have to do some rough electrical and plumbing. Here’s some electrical roughed in in the half bath:

I cut holes for the conduit with an angle grinder with a cut off blade. I welded the rough-in box to the wall framework.

As an aside, I finally got my plasma torch repaired in the city. Two, four hour round trips, $50 to diagnose, $25 to repair, and $0.39 for the new part. When I got it home, I fired it up, cut a nice round hole in a carriola for the electrical conduit. Fantastic! Then when I went to cut a second hole, it made a wild clicking sound (relay going bad?) and shut itself down. Okay fussy, finicky machine, fine, die that death if you want to. I’m done. So instead of nice round holes, I have nice square holes cut with the angle grinder. No law against round peg in square hole.

The above wall happened to be placed above a container floor beam so I couldn’t drill straight down for the hole for the conduit. Instead, I used two elbows to relocate the hole. Later, the concrete floor will cover this conduit:

Oh, one thing I discovered is that where there it a forklift pocket on the side of the container…

there is a steel plate under the wooden floor, so it is easier just to swing the conduit and relocate the hole through the floor away from the steel plate. This is all working for me because we will have the three-inch thick concrete floor to cover these conduits throughout the entire house.

By the way, speaking of the wooden floor, the floors in our containers are mahogany, just a tad under one and a quarter inches thick. We will be pouring a concrete slab floor because it is the surface that we want. Also, it will cover the wood which is no doubt heavily drenched in pesticide. Before I work in the containers, I use a large fan to flush the fumes. Otherwise it can make your eyes water.

So far I only have roughed in the water supply for the toilet in the half bath. I brought some PEX tubing with me when we moved to Panama and decided to use it to make the pipe stub-ups. I like PEX a lot, but so far have not seen it here in Panama. Here is some PEX, the brass fittings, crimps, and the crimping tool:

Blue for cold, red for hot. Same stuff, just color coded for easier identification .

Here’s the toilet stub-up:

You can warm PEX with a torch, bend it, and it will keep its new shape. I welded two pipe clamps to the side of the container. Later, this bathroom wall will get Plycem. That and the concrete slab will hide the plumbing.

The PEX, the PVC electrical conduit, and the PVC water pipes can all be cut with this dandy pair of shears made for the job:

In the meantime, Armando has been working for two days grinding away remnants of the container siding webbing in container 4. I’m glad that he has the Power of Youth still on his side.

You can see that he is wearing safety glasses (and not-seen earplugs), and the guard amazingly is still on the machine. I insist on it even though most workers here think these safety devices are mere nuisances. I’ve seen two nasty cuts from guardless machines and I’d just as soon not make a trip to the hospital.

Next I’m on my way down the mountain to see if I can get the DeWalt angle grinder that Armando has been using repaired. I think the switch has given up the ghost; it has had some rough duty during its life on this job. I’ll probably buy a second one, too; a guy can’t have too many angle grinders.

If you are considering a container house project, I hope that I have given you some good tips from my experience. Take what you want but you are on your own. Have fun. Keep the guards on your tools and be safe. It’s a jungle out there. At least it is here in Panama!

That’s all for now.

A Big Floor And Some Small Stuff

In this post, I frame the floor between #3 and #4, build some interior walls, and do some minor stuff.

A significant amount of rain has been falling, and I am happy to have a bunch of interior work to do. The interior of #3, #4, and the 12-foot space between is now bone dry. Not a drop of rain enters, thanks to Juan who mentioned in a comment that he uses Sika Urethane caulk to seal container seams. I searched but could not find that brand, but I did find some other urethane and it is working well. I sealed the two 40-foot seams where the walls that hold up the metal roof connect to the containers below. Here’s a photo of the urethane on the tilebacker wall:

Good and gooey and very workable, the solvent based urethane caulk is holding out rainwater. Remember, later I will build a sloping metal roof over the container roof.

Next, I had some 2″x2″ square metal tubing in my way so I built the framework for the wall that will hold the low end of the big roof between #2 and #3. I caulked the welds with the urethane and prime painted the metal:

The framework is at the top right of the photo. Most of the photos I have posted so far have been from the east side, but this one is from the west.

Next, while I waited for delivery of the metal for the big floor between #3 and #4, I started some of the interior walls in #3. The wall in this photo will divide the hallway (that goes from the living room to the master bedroom) from the half bath. The half bath will be about 4-feet by 8-feet.

This wall will get tilebacker on both sides, brand name Plycem. There will be a sliding door on the bathroom. I am standing in what will be a dry room -- a closet with a dehumidifier -- a real necessity here in the cool but humid mountains.

Then, before I made a big mistake with a bad paint and painted all of the exterior of the containers, I wanted to test out some oil based polyurethane red oxide primer and some white polyurethane wall paint, so I sanded, primed two coats, and painted two coats onto the 12-foot section between #3 and #4. I used my Fuji HVLP (High Volume, Low Pressure) spray gun. This is a nice rig and it sprayed the polyurethane on the metal siding like glass.

At least something is finish painted. Will it remain white or will we choose a color?

Finally, my delivery arrived and I could get to work on the 12-foot by 40-foot floor between #3 and #4 — that’s the space behind the white wall in the above photo. The floor will consist of 2″x4″ metal carriolas, covered by metal roofing panels, and topped with a 3-inch concrete slab that will extend throughout the containers, too. Here is the framing underway:

I have to admit to a small error; when I placed the containers on the columns, I placed these two exactly 12-feet apart measured from the outside of the containers. However, the floor joists ended up being about 12-feet two-inches long because I affixed them to the indented part of the container main floor support I-beam. I had to buy 14-footers. Should I do this again, I would move the containers a few inches closer to each other. Nevertheless, I can use the cutoffs for other projects.

To start the project, I measured off two-foot incriments, then used the angle grinder to take away some of the paint for easier welding:

A carriola floor joist is ready to slide into place and be welded.

To measure the lengths of the carriolas, I used two boards and a clamp, adjusting the length for each joist. You wouldn’t expect it, but the lengths varied due to various dents and strengthening gussets. Here’s a photo of the measuring jig being used to mark a joist for cutting with the chop saw:

After three days of cutting and welding, here is the floor framing finished and with two sheets of roofing metal screwed in place:

You can also see that I fashioned a center beam from two carriolas. Tomorrow Armando and I will pour three small footings to further support the concrete slab and to reduce any floor bounce. I also built the framework for the wall that will separate the bedroom (foreground) from the master bathroom.

Throughout all of this, Armando has helped me lift and tote the heavy stuff, but mainly he has been working to smooth out the lot. He is almost done:

You can really see his progress in this next photo taken from the northwest corner of the lot. He is taking out a lot of stumps and surface roots as he goes:

I can’t wait for windows! The big opening on the west wall of our bedroom will be divided into a window grid with 2″x2″ square tubing.

My next small task will be to finish cutting and removing a scrap strip of container siding metal and re-purpose it into a very short wall section that will go at the bottom of the bedroom window wall.

That’s all for now. Thanks for visiting my blog. I’m pleased that so many people have subscribed to receive notice of new posts, and it was fun to watch the 10,000 hits mark come and go right at the one-year mark of my blog. Here’s a screenshot of month-by-month hits:

A dip last year during "family business," but otherwise my traffic is growing! Please feel free to add your comments to my posts. Fred

Welding Frenzy ~ Welding On Shipping Containers

With the tilebacker walls in place, it was finally time to haul the welder up onto the roof of container four. The four-foot high wall that holds up the high end of the roof over the space between three and four was only tacked in place. I am now faced with the task of welding a forty-foot long bead, welding the wall to the roof of the shipping container.

Armando and I tried first to lift the welder with pulleys and a rope, but we were getting exhausted and the welder wasn’t budging far off the ground. When I bought the pulleys I wanted double-block (two wheels per unit) pulleys but could only find less mechanically-advantaged single-block pulleys. So we rigged an electric winch (thank you for the loan of the winch, Ivan) and effortlessly lifted the heavy welder to the roof. Once up on the roof, with the new ATW wheelbarrow wheels, the welding rig no longer bumps and bangs, but rolls across the corrugated roof very easily.

The wall to be welded is made up of metal siding cut from the wall of the container below. Here’s how the siding sits on the container. You can see that I have some significant gaps to fill while welding. White is the wall, red is the container roof.

This is the largest gap, about a quarter of an inch. Most of the spaces are about a sixteenth of an inch or the metals are kiss-fitting.

I really wasn’t looking forward to this welding task. If it rains, the gig is off. If it is sunny, working in a hot welding hood on the hot metal roof, body crouched so as to reach the area to be welded but avoiding flying sparks and splatter, legs falling asleep; no, I wasn’t looking forward to this task. But it had to be done, and afterwards no more water will enter the container below.

I also wasn’t looking forward to the job because I have been using number 6011 welding rods. These are the standard welding rod here in Panama and can be found in any hardware store and even some grocery stores right next to the duct tape. They burn paint away easily and work in any position. But they stick easily and this can be frustrating.

If you don’t know, the idea of welding is to touch the welding rod to the metal you want to weld, create a short circuit if you will, get sparks flying, then pull away slightly and maintain a gap that the fire jumps across, heating and fusing the metals. It is during this initial getting-the-sparks-flying stage that the welding rod can fuse itself (or stick) to the metal to be welded. If it sticks you have to wiggle the rod back and forth until it breaks free then start the process all over again. When I tacked the wall in place, there was a whole lot of sticking going on and I wasn’t looking forward to forty feet of frustration.

I have to declare here that welding is new to me. Previously my work life involved wood, glue, screws and nails. I learned a little bit about welding from Bob H. back in the States, just enough to get me going and make me dangerous as they say. I guess you could call me a back yard welder. I don’t know squat about the coefficient of this or that, or the temperature that bronze-molybdenum-strontium 90 alloy melts at. I only know to get the spark going and keep it going. So to all the professional welders who fall across this blog by mistake, those with multiple certifications in underwater welding and welding in deep space on the Space Station while holding a wet cat, please have pity on me for what I am attempting to do at this stage of my life, and maybe remember those first not-so-pretty welds that you made so many years ago. Thank you.

So for my birthday, friend Les gave me about ten pounds of not 6011 rods, but instead 6013 rods. I thought I would give them a try on this project. How bad could it be? As it turns out, not bad at all.

The ubiquitous 6011s burn real hot. They burn paint real quick. Lots of slag flies everywhere, the rods stick easily, and if you are thinking about last night’s fight with your wife and not paying 100% attention to counting the number of seconds that are passing, you can burn a hole in the metal the size of Texas.

Even though technically in the same family (I don’t really know this for sure, I’m making this up), the 6013s are a real pleasure to work with. If the 6011s are a stay-out-all-night rebellious teenager, the 6013s are their stay-at-home studious twin. Rod sticking is much, much less with the 6013s. They burn hot enough to eat through the numerous layers of paint on the container roof, but the burn is more surgical if you will. There is less flaming slag flying over the top of my welding helmet, thereby burning fewer holes my scalp. Both rods seem to want to burn well for me with 60-amps set on the dial of the welder:

The new (to me) 6013s also don’t burn big holes in the metal nearly as easily. And if I do burn a hole, I can close the doughnut hole much more easily. A blob of the 6013 seems to stay in place as it cools making closing the hole quite easy, whereas the 6011 blob shrinks as it cools, leaving the hole almost as large as when I started. And if I switch the amps down from 60 to 40, the holes close quite rapidly.

To weld, you have to keep the welding rod moving. There are numerous techniques: the back and forth wiggle, the circle swoop, etc. The technique that I found to work best for me is this: working in the general form of a backwards letter C, maybe something like this:  ]  , I start at the bottom left of the backward C.  I get the spark going and sit in one place on the roof of the container for a second-and-a-half to two seconds, burning paint and making a small puddle of molten metal. Then in the next second I sweep to the right and up, then over to the left. Then to prevent creating a hole, I get the heck out of Dodge, wait for the new metal to cool for a second, then repeat. I’m left handed and am working from right to left. So if you are right handed maybe you will find a forward C and left to right easier. Your mileage may vary.  If you figure that I move about an eighth-of-an-inch at a time, that makes only 3,840 repetitions in the forty-foot long stretch. It goes like this: weld, weld, weld, move, stretch, drink water, repeat. Simple.

Here is a photo of the mess I am making:

A lot of the mess is paint that has burned and flaked, and the weld cleans up fairly well with a wire brush. It looks to me like it will keep water from leaking into the house. Here is the weld all wire brushed but not prime painted. The roof was too hot and the paint probably would have boiled. Hey, maybe Monday I’ll fry some eggs for lunch.

I got to the half-way point today before I sensed the blisters on my knees from the hot roof. I quit about 2:00. Monday weather permitting I will be back at the second half. With my new knowledge of the 6013 rods and my experience today, I’m not dreading the second half at all. Still, it will be good to be done with this part of the job. I will have to repeat this process when I erect the wall over container two. Stairs will lead up to this wall, and a door will take us out to the roof deck. I am anticipating the hammock swinging in the breeze.

Thanks for the swell welding rods Les! That’s all for now. Happy welding!